Project Total = 100 Points
Deadline Requirement/ 1:55 Fri Jan 17th(10 Points):
Planning Sheet (10 Pts):
Turned in and approved by the end of Day 2. Time Requirement (10 Points):
The minimum time limit is 3 minutes. The maximum is 5 minutes. 2:41-3:00 or over 5 minutes = 9 Pts 2:21-2:40= 8 Pts 2:01-2:20= 7 Pts 1:46-2:00= 6 Pts 1:31-1:45= 5 Pts 1:16-1:30= 4 Pts 1-1:1:15 = 3 Pts 46 sec-59 sec = 2 Pts 30-45 sec = 1 Pts <30 sec = 0 Pts |
Show Content Requirement (20 Points):
Graphics/ Visuals Requirement (10 Points)
Graph(s) Requirement (10 Points):
Music Audio Requirement (10 Points):
|